|
|
|
|
|
|
we mixed piles of cob every morning with a rented
BobCat
|
|
|
the first foot went on in just a few hours
|
|
|
cob was delivered to the walls by bucket full
and then pitch-forked directly onto the wall
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
at three weeks, 6 feet of cob
|
|
|
built-in shelves in the office
|
|
|
native juniper wood headers set directly in
cob
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
at six weeks 8-10 feet of cob
|
|
|
arch in bedroom
|
|
|
sisters Kindra and Kerri cobbing on the
kitchen wall |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LadyAnn trimming at sunset
|
|
|
LadyAnn admires Travis' cobbing pants which
have reached a slightly scandalous state of disrepair
|
|
|
team photo taken just before
Thanksgiving, LtoR: Chef Hop, Kindra, Chris, Sara, Travis, LadyAnn,
Jared |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
eight weeks: cob 9-12 feet
|
|
|
time for rafters
|
|
|
setting rafters on a round wall requires lots
of stringline, levels and cob adjustments
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
rafters in place and walls fill in between
|
|
|
Chris shows his power-chord on the pitchfork
|
|
|
Sara insalls our native bamboo, "River
Cane", as a soffit between rafters
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Jared basks in the shadows of his cane work
|
|
|
shadow lines on a curved wall
|
|
|
roof layers
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
billboards: the new tarp
|
|
|
cob lifts
|
|
|
fondue for lunch
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
and then it rained for the first time since
Sept. .... 9 inches in 24 hours turned the little puddle in the
meadow in to lake overnight
|
|
|
...and we all waded/canoed in to retrieve our
stuff from the murky water inside our tents.
|
|
|
showers -> flowers
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sara's specialty: rock and plaster intersections
|
|
|
rough plaster in the bedroom
|
|
|
the roof is complete!
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
limestone sills purchased from a stone graveyard
and carved by Jennifer to fit each window
|
|
|
Travis muscles in the main layer of the earthen
floor in the kitchen/office as Mikey mixes outside
|
|
|
Ladye Anne packs in the the top of the bathroom
walls with light claystraw... actually in this case: lightlimestraw
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Robert and Jennifer in the sitting nook
|
|
|
earthen finish plaster in the bedroom... silky
smooth!
|
|
|
recessed nook for bed (stain glass to come)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
...Gino and Even have phase 2 foundation ready
to go
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
June 2007
view from the lake. exterior lime plaster by Frank Meyer and
crew.
|
|
|
|
|
|
solar tube light on unfinished cob wall
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
open windows collect breezes in the bedroom
|
|
|
wide angle view of future kitchen
|
|
|
stain glass in bedroom
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
solstice:building in full shadow
|
|
|
view from NW |
|
|
marble window sill |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
cork wallpaper going on ceiling
|
|
|
Jef and Elena building kitchen island
|
|
|
finish floor ready to be sealed with linseed
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
walls getting color
|
|
|
morning light in the kitchen
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|